This is the multi-page printable view of this section. Click here to print.

Return to the regular view of this page.

Protocols

This is the Protocols section.

1 - Blackout

codename: Riddick

Procedure

  • Inform basement tenants to avoid using bathroom and sink until power restored.
  • In event of rain storm well must be emptied (@todo backup sump pump or backup power)
  • Turn off servers (need to avoid intermittent power restores)

2 - Flood

codename: Mario Bros

Check

  • Storm well
  • Is there power to sump pump

Action

  • Turn off water main leading into house
  • if storm well is source of flood:
    • drop a sump pump and dump excess water to front lawn

Preventative Measures

  • install zigbee water sensors.
  • determine count
  • determine if one hub can cover the house
  • look into ways to use only one sensor for both sink and toilet. (run a towel or paper)

the water filture kit has a mechanical switch that cuts water lead upon getting wet. It’s specifically designed for the water leading into the filter unit but maybe there’s something similar for standard water lines.

Notification

codename: Brick Tamland

Notification Method

chosen:

  • email (natively available to grafana)

excluded:

  • sms (not free)
  • ai calling (unnecessary)
  • push notification (needs hosting)